SelectYourLanguage

Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2

eurocol
977 EUROPLAN PRO

977

Self-levelling compound, cementbased, ideal under parquet, excellent self-levelling and layer thickness up to 10 mm.

977_europlan pro.jpg
  • safety data sheet_eurocol_977_europlan pro_uk.pdf

    safety data sheet_eurocol_977_europlan pro_uk.pdf

  • pdf-product-specification.pdf

    pdf-product-specification.pdf

  • licence_977-pro_ce-dop_2022_uk.pdf

    licence_977-pro_ce-dop_2022_uk.pdf

  • licence_977_ec1plus_2020_uk.pdf

    licence_977_ec1plus_2020_uk.pdf

Product Typification

TODO
Basis : Cement-powder with additives and a high synthetic binder content.
Colour : Gray.
Consistency : Powder.

Product advantages:
  • High-quality, universal, low-stress setting, self-levelling compound, cement-bound.
  • For very heavy duty use.
  • For levelling mineral subfloors, ceramic tiles, natural stone coverings, terrazzo, screwed wood-based panels (V100 P4 - P7, OSB 2 - 4), mastic asphalt and on approved Eurocol decoupling boards (e.g. 823 Eurofloor Reno).
  • Can be used in layer thicknesses up to 10 mm, on mastic asphalt up to 5 mm.
  • For subsequent floor covering work.
  • Pumpable up to 75 m hose length.
  • Squeegeeable.
  • The product can be used on underfloor heating and is suitable for use with chair castors according to DIN EN 12529.
  • For indoor use.
  • Very low emission installation material, certified according to EMICODE EC 1 Plus.
  • Certified by baubook, "ecological building product".

Performances

Bureau Wheelchair resistance : From 2 mm layer thickness.
Classification : CE: DIN EN13813: CT-C30-F10-A1fl.
Consumption : Approx. 1.5 kg/m² per mm layer thickness.
Frost resistance : Yes.
Passableness : 2 - 3 hours at (18 - 20) °C.*
Special quality : Can also be used under parquet flooring.

Application

Application:
For producing even and absorbent surfaces for floor covering and parquet work.

Working Process

Layer thickness : Maximum 10 mm.
Tools : Trowel or notched squeegee in combination with a spiked roller, mixing-device.
Mixing ratio : Add 25 kg of 977 Europlan PRO to 6 - 6,5 litres of water.
Waiting time : Approx 3 minutes.
Processing time : Use within 30 minutes after mixing.*
Storage : Store cool and dry.
Shelf Life : Approx 6 Months, in unopened packaging.
Drying : Approx. 24 hrs. by 3 mm layer thickness, for each additional 3 mm - another day of drying time is required.
Cleaner : Water.
Frost-proof : Yes.
Remarks : 

For layer thicknesses over 10 mm, on moisture-sensitive (e.g. calcium sulphate screeds) or unstable substrates, Eurocol reactive primers, e.g. 042 Euroblock Turbo or 021 Euroblock Reno LE should be used.

For layer thicknesses over 10 mm, on screwed wood-based panels, Eurocol reactive primers, e.g. 042 Euroblock Turbo or 021 Euroblock Reno LE should be used. 

Not suitable for solid planks <22 mm and vertical lamella <16 mm thick.

Technical information and safety data sheets of other laying materials and floorings/parquet must be observed!

Apply flooring to the filled area within the next few days!
For absorbent subfloors keep a minimum layer thickness of 2 mm, for non-absorbent subfloors a minimum layer thickness of 3 mm.
When used under parquet, a minimum layer thickness of 3 mm must be observed.

In case of multi-layer application, the layer thickness of the second application must not exceed the layer thickness of the first application.

After application of levelling compound.

  • Fresh surfaces should be protected against direct sun light, draughts, high temperature (above +30°C), rain and frost.
  • To obtain the recommended long term technical performance of product, after finishing levelling works installation of floor covering should be done within the shortest period of time, which depends on product’s drying time within 3 to 7 days, otherwise the surface should be protected with a suitable coating or covering.
Not suitable on floating dry screed elements or floating wood-based panels.
The readiness for laying is dependent on the thickness of the layer and depends in particular on the climatic conditions on site.

Wear protective glasses and gloves.
If the adhesive or installation material comes into contact with your eyes, wash out immediately with plenty of water and consult an ophthalmologist.
Protect your hands with waterproof, robust gloves.
Wear long trousers.
Avoid prolonged skin contact with the adhesive or installation material. Thoroughly clean affected skin parts with water immediately.
The longer fresh adhesive or installation material remains on your skin, the greater the risk of serious skin damage.
Keep children away from fresh adhesive or installation material.

EMICODE, for more information visit www.emicode.com. For levelling work in connection with subsequent parquet adhesives using Eurocol 1K or 2K parquet adhesives, only use Eurocol 048 Europrimer Plus or reactive Eurocol primers.

* The mentioned values have been established in our laboratory and must be considered as guidelines in view of possible variations in climatic circumstances, subfloor compositions and layer thickness.

Consumption:
Approx. 1.5 kg/m² per mm layer thickness.

Substrate:
  • The substrate must be permanently dry, resistant to pressure and tension, free from cracks and dust, even and free from layers that reduce adhesion.
  • Adhesion-reducing layers, old material residues must be removed by suitable mechanical measures in accordance with the specifications of DIN 18365.
  • Old fixed floors, such as ceramic tiles, terrazzo, stone floors, are to be professionally cleaned with Eurocol 891 Euroclean Basic and sanded matt after drying. 
  • A primer coat of Eurocol adapted to the substrate and the expected layer thickness of the leveling compound is to be pre-coated. Allow the applied primer to dry thoroughly.
  • Cracks or joints (except structural expansion joints) must be closed with Eurocol Europlan 913 Silicate sealing compound. 
  • Appropriately dimensioned Eurocol edge strips are to be used for rising building components.
  • Level out coarse unevenness in advance with stable filling compound. After complete drying, the surface must be primed again.
  • In the event of defects, objections must be reported in writing.


User manual:
  • Mix the powder in the specified quantity (see technical data) with clean, cold water using an electric mixer to form a smooth, lump-free mass. 
  • It is recommended to keep a maturing time of 2 - 3 minutes.
  • When pumping, set the mixing device so that a correct quantity of cold and clean tap water is added. Determine the spread size! Rinse the machine and hoses also during breaks to prevent hardening within the machine system. Please consult your pump manufacturer.
  • Avoid overwatering, as this leads to sedimentation and the formation of unstable surface layers. Drying is also delayed.
  • Apply the ready-mix within the working time in one working step if possible until the desired layer thickness is achieved.
    By using a squeegee and a spiked de-aeration roller, a smooth, even surface is obtained which usually does not need to be sanded.
  • During the setting of the levelling compound, draughts and intensive sunlight must be avoided.
    This can lead to a too fast withdrawal of moisture, which "burns" the filler layer, pulverizes the surface edge zone and shrinkage cracks can occur.
  • When laying on underfloor heating, the heating must be kept in operation for 3 days before, during and up to 7 days after laying with a surface temperature of 18 - 22°C.
  • In the case of multi-layer levelling, apply an intermediate coat of completely set first levelling compound before applying the second, alternatively use a levelling compound suitable for the required thickness of the layer to be applied, in order to level in one operation.

Working conditions:
Required surrounding temperature: min. 18°C.
Material and subfloor temperature: min. 15°C.
Relative humidity: 35 - 75%, recommended <65%.





Quality and guarantee

Environment and health

GISCODE : ZP1
LEED : VOC 0 g/l, meets: IEQ Credit 4.1
DGNB : VOC 0 %, quality level: 4
Hazard Class : Observe notes in the safety data sheet/label!
Safety and environment : Safety data sheets of Forbo Eurocol products according to EEG-guideline 91/155. Wear protective gloves and safety glasses! Keep out of reach of children. Do not eat, drink or smoke while processing the product. Only give completely empty containers for recycling. Material residues can be disposed of as household waste.
MSDS : For detailed information about the safety measures please refer to the safety information sheet on our website www.forbo-eurocol.de.
Substances causing allergy : Contains Cement, portland, chemicals, flue dust. May produce an allergic reaction.


Articles

articelproductnamepackagingshipping unit
977Europlan Propaper bag à 25 kg42/pallet