SelectYourLanguage

Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2
Pulldown 2

eurocol
148 EUROMIX WOOD

148

2-K-PUR wood flooring adhesive, easy to apply, excellent ridge formation for parquet laying, very long installation time.

148_euromix wood with hardener_medium.jpg
  • pdf-product-specification.pdf

    pdf-product-specification.pdf

  • safety data sheet_eurocol_148_euromix_wood_uk.pdf

    safety data sheet_eurocol_148_euromix_wood_uk.pdf

  • safety data sheet_eurocol_härter 148_pu-lot_uk.pdf

    safety data sheet_eurocol_härter 148_pu-lot_uk.pdf

  • licence_148 wood_abz_z-155_10-203_2023_uk.pdf

    licence_148 wood_abz_z-155_10-203_2023_uk.pdf

  • licence 148 wood_ec1plus_uk.pdf

    licence 148 wood_ec1plus_uk.pdf

Product Typification

TODO
Basis : Polyurethane resin and isocyanat hardener.
Colour : Beige (A), brown (B).
Consistency : Pasty.

Product advantages:
  • Hardelastic tying (ISO 17178), water-free, solvent-free two-component adhesive.
  • Adhesive with extended processing time, highly resilient. Shear-resistant curing.
  • For laying standard-compliant parquet such as strip parquet, mosaic parquet, industrial parquet (including 10 mm), standard-compliant solid floor boards (>= 15 mm thickness (thickness ratio of less than 1:10)), solid lamparquet products, multilayer parquet, panel parquet, according to floor covering manufacturer’s instructions.
  • Bonding is performed on standardized cement and calcium sulphate-based screeds, poured asphalt, wood based panels and gypsum fiber boards suitable for laying parquet, Eurocol decoupling and insulating underlays (e.g. 823 Eurofloor Reno, 820/821 Eurofloor Comfort, 804 Eurofloor Reno Fleece), and on nonabsorbent subfloors (e.g. fixed and cleaned ceramic and natural stone slabs, artificial stone).
  • Can also be used on sprinkled with quartz sand Eurocol reactive primers approved for its application.
  • Sanding and sealing of parquet is possible after about 24 hours.
  • The adhesive can be used on floor heating.
  • Very low emission laying material certified according to EMICODE EC1 Plus.
  • Emission-tested building product according to DIBt principles.
  • For indoor use.


Performances

Consumption : 

depending on parquet format and subfloor, 

approx. 900 - 1000 g/m² (TKB/B3), approx. 1100 - 1300 g/m² (TKB/TKB11-B15).

Curing : Approx 24 hours. *
Flammability : Non-flammable.
Frost resistance : Yes.
Special quality : Very long open time.

Application

Application:

For laying standard-compliant parquet such as

  • strip parquet,
  • mosaic parquet, industrial parquet (including 10 mm),
  • standard-compliant solid floor boards 15 mm thickness (thickness ratio of less than 1:10), 
  • lity parkiet lamelowy (lamparkiet),
  • multilayer parquet, panel parquet,
  • bamboo parquet.

Working Process

Tools : Adhesive spreader. The type of spreader depends material and subfloor.
Open time : Approx. 75 minutes.*
Mixing ratio : 100 parts by weight of component A 10 parts by weight of component B.
Processing time : Use within 75 minutes after mixing.*
Curing : Approx 24 hours. *
Storage : Store cool and dry in unopened packaging.
Shelf Life : Approx 18 months, in unopened packaging. Do not mix partial portions.
Cleaner : 815 Euroclean HandClean, 358 ToolCleaner.
Frost-proof : Yes.
Remarks : 

Technical information and safety data sheets of any installation materials and floor coverings used must be observed!
It is recommended to wear suitable gloves when applying the adhesive, as the reaction components penetrate deep into the skin, penetrate and are difficult to remove. Cured adhesive can only be removed mechanically.
The adhesive has excellent adhesion properties on most materials. Due to the large number, in case of doubt to carry out adhesion tests during processing.
When bonding to underfloor heating, a stabilising primer with approved Eurocol-Reaction resin primers necessary. In order to reduce adhesion problems on reaction resin primers, these are available in the sand off excess with Eurocol 846 Europlan sand.
The adhesive cures even at lower temperatures. However, due to the higher viscosity at low temperatures affects the processing. The curing time is considerably longer. 

The adhesive is not suitable under not fully aired (not odourless) smoked oak.

Not a consumer product according to 1999/EG/44.


* The mentioned values have been established in our laboratory and must be considered as guidelines in view of possible variations in climatic circumstances, subfloor compositions and layer thickness.

Consumption:

depending on parquet format and subfloor, 

approx. 900 - 1000 g/m² (TKB/B3), approx. 1100 - 1300 g/m² (TKB/TKB11-B15).



Substrate:
  • The substrate must be pressure- and tension-resistant, permanently dry, free of cracks and dust, even and free of layers that reduce adhesion.
  • Adhesion-reducing layers, old material residues must be removed by suitable mechanical measures in accordance with the specifications of DIN 18356.
  • Old fixed floors, such as ceramic tiles, terrazzo, stone floors, metals, must be professionally cleaned and sanded matt after drying.
  • Cracks or joints (except structural expansion joints) are to be closed with Eurocol grouting compounds Europlan 913 Silicate.
  • To reduce adhesion problems on reaction resin primers, they should be sprinkled in excess with 846 Europlan Sand.
  • When laying large-format parquet elements, it is necessary to ensure that the laying surface is even.
  • In case of defects, concerns must be reported in writing.


User manual:
  • Before use, temper the product according to the processing conditions.
  • Empty the hardener component completely into the resin component and mix homogeneously with a suitable stirrer for approx. 5 minutes, also in the wall and bottom areas of the containers. Immediately decant into a clean container and mix again.
  • Apply the adhesive evenly to the substrate with a toothed strip adapted to the installation and the substrate roughness. If necessary, the toothed strip can be adjusted accordingly to achieve sufficient grooved back wetting.
  • To extend the working time in the warm season, the material can be mixed, homogenised and then distributed from the container in a puddle-like manner. From the puddles the material is evenly distributed.
  • When laying the parquet, do not press glue between the elements to prevent adhesive marks in the joints.
  • Since with reaction adhesives a slight "floating" of the material to be laid cannot be avoided, the laid surface must not be walked on within the first 2 hours. If it is necessary to walk on the surface, load distribution plates must be used to avoid crushing of the adhesive.
  • When working on parquet, ensure that the installed parquet is approx. 1.5 cm away from the wall.
  • If necessary, the glued floor coverings must be weighted down during the entire setting time, especially in the case of long parquet elements.
  • After a setting time of approx. 3 - 4 hours, roll the floor once again with a multi-section roller.
  • Sanding and sealing is possible under standard conditions after setting of the adhesive. Sanding is delayed at low temperatures.

Processing conditions: 

at least 15 °C floor temperature,
at least 18°C material and room temperature,
35-75% relative humidity, recommended <65%.

Recommended primers:
Eurocol 048 Europrimer Plus                 dustbinding and primer under levelling compunds
Eurocol 015 Euroblock MS                    grinding with black pad necessary
Eurocol 042 Euroblock Turbo                 can be used without sanding
Eurocol 021 Euroblock Reno LE             must be sanded
Eurocol 028 Euroblock Rapid                 must be sanded






Quality and guarantee

Environment and health

GISCODE : RU1
LEED : VOC 0 g/l, meets: IEQ Credit 4.1
DGNB : VOC 0 %, quality level: 4
Hazard Class : Component A: None. Component B: contains hazardous ingredients. Please observe the notes in the Safety data sheet!
Safety and environment : Safety data sheets of Forbo Eurocol products according to EEG-guideline 91/155. Keep out of reach of children. Do not eat, drink or smoke while processing the product. Only give completely empty containers for recycling. Bound material residues can be disposed of as household waste. From 24.8.2023, training is mandatory for handling preparations containing isocyanates. https://isopa-aisbl.idloom.events/049-de
MSDS : Available on request.
Substances causing allergy : Hardener: contains isocyanate. May cause allergic reactions.





Articles

artikelproductnamepackagingshipping unit
148Euromix WoodPE combi pack à 9,625 kg52/pallet